How To Level A Backyard With A Slope

Our landscape designer robert smiddy shows 2 methods of dealing with a slope in the landscape.

How to level a backyard with a slope. Now the multi level deck stretches across the entire back of the townhome. Planting a slope with a relaxed mix of hardy low maintenance plants rather than neatly lined up specimens that require a lot of care is a great way to make a garden slope attractive. Since the grade is most important near the foundation of the house that s the first place to check it and you can do this with a pair of wooden stakes some string a line level and a tape measure.

In many ways progress is a good thing but when it comes to that steep slope in your backyard progress is not a good thing when all the soil starts washing away. Slope erosion control grids. While leveling an existing yard one has to bear in mind that the yard should slope away from the house.

How to find the right native plants for your yard. The backyard would be more of a challenge because the developer had used a bulldozer to scrape the building site out of a steep hill of chert. Thus the yard will not have any problems such as water accumulation or unevenness during the rainy season.

Changing the slope of your yard is labor intensive and depending upon the slope may be cost prohibitive. Hence it is recommended that the yard should have a 3 to 2 inches downward slope every 10 feet or so. Determine the vertical distance of your yard from the top to the bottom of the slope the rise as well as its horizontal distance the run by pounding a wooden stake into the ground at the top of the slope and a second stake at the bottom.

You need to slope the yard away from your house to prevent water from puddling against your foundation and eventually entering the home but you can lessen the degree of the slope and improve the functionality of the yard with a retaining wall and fill dirt. Measure the rise and run of your garden. Remove all vegetation from the sloped backyard.

Plus you won t need to clamber around on it with the pruning sheers every weekend. Pound one stake into the ground next to the foundation and the second about 8 feet away.

Source : pinterest.com